Bluetooth|Aug.
● Bluetooth Member Summit + UPF Testing Event
-
The event will be held at the Westin Bellevue
- From 9-14 September 2024
Thunderbolt|Aug.
● Thunderbolt products must use certified TBT4 orTBT5 connector, and there is no transition period and exception from now on.
● Barlow Ridge PRQ date: 2024.07.30
USB|Aug.
● RFI Testing Required for Gen 1 (5Gbps) and up capable End-Product USB Type-C hosts and peripherals
-
Applicability table in specification will be updated to reflect this.
Wi-Fi |Aug.
● The WFA announces:
-
Wi-Fi EasyMesh Specification v6.0
-
Wi-Fi EasyMesh Test Plan v6.0
»This update shall be effective December 31, 2024.
»Beginning December 31, 2024, all new Mesh tested devices must support in this version.