Allion Compliance Update

Bluetooth|Jun.

● On June 11, the Bluetooth SIG Board of Directors approved the new (QPRD) v3, which outlines the new Bluetooth Qualification Process

Intel EVO (Project Athena) IAT Test|Jun.

● Intel EVO System Design Spec. 5th Edition rev.1.0 released in May 2024 for Lunar Lake and Arrow Lake Platforms.

Matter|Jun.

●  CSA Member Meeting – Washington, DC

  • Jun 24-27, 2024

  • Washington, DC

USB|Jun.

● Allion Labs Taiwan is approved for USB 3.2 Gen 2×2 Host and Peripheral testing.

● The products below must attend the PIL for certification, if it is the company’s first USB4 certification.

  • USB4 v1 Silicon Hosts and Hubs/Docks

Wi-Fi |Jun.

● Wi-Fi CERTIFIED WPA3 and Wi-Fi Enhanced Open Deployment Guide has been published.

This entry was posted in . Bookmark the permalink.